Back on Christmas Eve of last year there were some reports that Elon Musk was in the process of shutting down Twitter’s Sacramento data center. In that article, a number of ex-Twitter employees wer…

  • @redcalcium
    link
    English
    5
    edit-2
    10 months ago

    Physically move them is one thing. Reassigning each server into the new data center network is a whole other thing. It won’t be as simple as connecting the power and network cables. From the post, the rack density is different so you’ll probably have to change the each server name to match the new rack position. Then the hostname and subnet probably changes in the new data center, so now you’ll have to map everything again (the hard coded references to Sacramento mentioned by Musk). The 100MM contract means they have a lot of servers to account for. This is the real headache of the migration and probably the reason Twitter keep having random outages for months after this stunt. They probably took shortcut and can’t bring all those servers online in time to handle traffic bursts which leads to another Musk’s shenanigans (e.g. forbidding visitors from viewing tweets unless they’re logged in to limit servers load, etc).

    Edit: the more I think about this, the more my head hurt. If any infra people reading this, what are you going to do if you suddenly received truckloads of servers yanked from another data center location and told to bring them online again ASAP, while more than half of your team has been laid off? Seriously, what’s the step you’re gonna do to bring all these servers online again? Oh, and those servers probably not gracefully shut down and just have their power cable yoinked off.

    • @flathead@lemm.ee
      link
      fedilink
      English
      210 months ago

      Oh by no means am I suggesting it was reasonable to do this. Musk would be a fucking nightmare as an employer. As a customer probably not much better but you know what they say about a fool and his money. This fool would be a great customer as long as you had a good lawyer to write the contracts.

      I do suspect that some of the details of this story are somewhat embellished though, if only for the sheer joy of it, which I’m all for. It’s a great story. I don’t believe, for instance, that they could possibly have moved 5000 racks - or even 5000 servers - as I think the story was intimating. It sounds like they filled a few semis, which would be a small fraction of the systems. Maybe this was just the last of it that was too hard to move earlier. As for the rack configs at the other end, they would need power and services and an empty space if they are just rolling the stuff in. That’s only a few weeks of lead time in a properly run facility.

      If they had their reservations set up correctly they wouldn’t need to change hostnames or even addresses, just wheel in the racks, brace and connect them. Ideally stuff would be shut down gracefully, but it shouldn’t really matter if they just pulled the plug. The software should be resilient enough to restart ok. Again, no idea if they had anything thought out, probably not, given the way it was done. But I have seen a big tech co move several rows this way when they basically couldn’t be bothered figuring out how to logically migrate them. Of course they weren’t doing it with a coked up CEO at 2am on Christmas Eve, but it wasn’t as difficult as you might imagine. But yeah not 5000 racks at once. Not even close to possible.